Pre-pour boom inspection checklist
A pre-pour boom inspection is a short, repeatable walk-around that checks the structure, hydraulics, controls, delivery line and setup before concrete goes in. This checklist is a general guide and does not replace your manufacturer's inspection schedule or your regulator's requirements.
Why a checklist beats memory
Faults on a boom pump are often easy to spot, but only if someone is looking. A written routine means the same checks happen on the first job of the week and the last job of the day. Pre-pour inspection is quick when it is a habit, and far cheaper than a breakdown in the middle of a pour.
This list is a starting point. Add the items your manufacturer and your regulator require, and keep a record of what you find.
1. Walk around the truck
- Tyres, wheels and wheel nuts
- Leaks under the truck and pump
- Lights, mirrors and warning signs
- Fluid levels, including hydraulic oil and water tank
- Guards and covers in place, with nothing loose or missing
- Tools and cleanout gear secured and complete
2. Outriggers and stability
- Outrigger legs, pads and cylinders for damage or leaks
- Pins, locks and leg extensions moving freely and locking positively
- Spreader pads in good condition
- Ground checked before setting down
- Machine level after setup
- Setup matched to the boom work that is planned
3. Boom structure
- Visible cracks, bent sections or damaged welds on the boom sections
- Hinge pins, retaining bolts and bushes secure and not excessively worn
- Hydraulic rams and hoses free of leaks, chafing and damage
- The boom lock released correctly and the travel supports clear
- Delivery pipe along the boom free of excessive wear, dents and leaks at the couplings
4. Delivery line and end hose
- Pipe wall wear at bends and the delivery line clamps
- Couplings and gaskets intact and closing fully
- end hose free of cracks, bulges, exposed reinforcement and soft spots
- Any safety chain or restraint in place and in good condition
- The line's pressure rating suits the pump's maximum pressure
5. Pump unit and wear parts
- Hopper, agitator and grate in place and free of old concrete
- Wear on the wear plate and cutting ring within the manufacturer's limit
- Seals and cylinders showing no unusual leakage
- Lubrication points greased
- Oil level, oil temperature and filter indicators within range
6. Controls and safety systems
- Remote control charged, working and matched to the machine
- Cabled backup control if fitted
- Emergency stop buttons on the machine and the remote working, tested before the pour
- Warning lights, alarms and limit switches working
- Gauges readable and responding
7. Site checks before unfolding
- Overhead power lines identified and clearance distances confirmed
- Exclusion zone marked
- Placing crew briefed on signals and who gives them
- Truck access and discharge point agreed
- Weather and wind conditions inside the machine's limits
What to do with a defect
If a check fails, do not pump through it. Record what you found, tag the machine as unfit if it is a safety item, and arrange repair before the next job. Safety-critical items include structural damage, a failed emergency stop, damaged outriggers and any hydraulic leak on the boom.
Keep inspection records. They show a pattern over time and prove the checks happened.